Newgrf update

Yes, another newgrf update, but this time I have a more important message than usual: I have updated some of Aegir’s newgrfs. This might break compatibility with old savegames, if it does you should download this old package.
I also added some new grfs, also made by Aegir IIRC, so I hope you guys have fun with the new newstations.

With this update also comes a restart of the sandbox, and guess what, we have a toyland game now so have some fun with the choo-choos.

A Glimpse into a Game

Greetings, readers.

This post is dedicated to the baddies of #OpenTTDCoop, the 2*45 curves and realism.

Oh, the 2*45. OMG’d over whenever spotted, as you might expect.
Sometimes those slip by with no one really noticing, and we have a great example of that.

Oh, the horrorIf you can’t see those baddies there, no problem. I have prepared a more clarified example, which obviously is the same area but with transparent buildings and trees enabled.

Those poor people must have pretty noisy environment with all those trains, albeit slow, going around and around. Slow, you ask? Yes, due to those 2*45 curves mentioned earlier. The other reason agains 2*45 curves is that they are totally not realistic. (Most) Real trains just can’t bend around themselves in such a small area (3×3 tiles in OTTD).

Realistic(?) BridgesSpeaking of realism, OTTD sure does hate it, given the above example and the fact that one train holds ONE THOUSAND passengers while a station, no matter how huge, holds a mere
four thousand. We at #openttdcoop obviously love it, and it makes some amusing contradictions. Gameplay is greater than realism, it seems.

The bridges at the right are a very good example of this. Our goal was to have it realistic, as real Shinkansen rail have loads of bridges and tunnels. I doubt it has double double-rail bridges per direction though. My solution to that would have been a landbridge, due to not looking like arse and not needing doubling for signal blocks. We could have pretended that the landbridges were actual long and large bridges, but no, no landbridges
because the Japanese don’t make those! Fine enough, I didn’t need to build those bridges.

Example SLHOh, and for general hackiness, let’s have a look at some of our.. renovated sideline hubs (SLHs).
It was originally a T-shaped hub, one branch from the trunk line. Later we decided it wasn’t enough, and needed two branches from the trunk line here, one to each direction. It isn’t that bad really.. Note that the Shinkansen tracks and trains allow for full speed with two-tile curves.

Rebuilding existing SLHs can be done in many ways, from just hacking up that extra entry and exit to major rebuilding and refitting. Another example (by yours truly). Other somewhat amusing SLHs have been built in this game too. I mentioned earlier that the Shinkansen set allows for 2-tile curves.. well, you have a very elaborate example too.

Oh, and if you got all excited about this, don’t hold your breath. I’m not committed to daily or weekly updates 🙂
note: popularity might change my attitude though

#openttdcoop goes feedburner

As this is a blog we want to get the most out of it and therfor our feeds changed.
Feedburner is a webservice managing quite a load of RSS-Feeds and our ones nowadays too.
Please update the URL’s of your subscribed feeds:

Blog: http://feeds.feedburner.com/openttdcoop
Blog-Comments: http://feeds.feedburner.com/openttdcoop_comments

Thank you,
Osai

All of you can comment again

Hey guys,
I installed Akismet recently and now the Spam is gone. At least I hope so.
All of you can comment again, without registration. Anyway we appreciate if you register and become an active blogger.

Shinkhansen, SBahn

Menway-on-sea is part of the Shinkhansen Network now!
Menway-on-sea is a small town, a sleeping beauty in the deep forests of the nation. In the year 1965, this situation suddenly changed: executives of the grand national rail company “Kasimasi Transports” decided to connect the town to the newly invented Shinkhansen Network, a highspeed train network for passenger transport only.

SBahn and Shinkhansen integrated into the landscape
As you may imagine, local authorities were not amused about Kasimasi Transports’ proposal. Both sides agreed on a clause about noise barriers, afforestation and environmental efforts carried out by the train company. As you may see on this aerial photo, Menway-on-sea received both a highly efficient commuter system and a link to the nationwide high-speed-train network.

-->